
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1138		2		92
1137		3		99
1126		4		103
1124		5		109
1120		6		114
1112		7		121
1108		8		125
1101		9		128
1095		10		131
1089		11		135
1083		12		140
1071		14		146
1070		15		151
1065		16		153

Optimization completed
----------------------
number of nodes     : 27
number of edges     : 58
number of demands   : 702
first solution time : 3
optimization time   : 180299
initial max maxLinkLoad    : 1149
final max maxLinkLoad      : 1065
number of tunnels   : 17
pre-optimization max link utilization 1.1499977360979998
post-optimization max link utilization 1.0660522269200001
1 demands over 702 (0.14245014245014245%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.31756553
