              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1149		1		115
1136		2		129
1124		3		140
1116		4		146
1112		5		157
1103		6		165
1099		7		184
1091		8		194
1087		9		229
1081		10		232

Optimization completed
----------------------
number of nodes     : 27
number of edges     : 58
number of demands   : 702
first solution time : 8
optimization time   : 180787
initial max maxLinkLoad    : 1161
final max maxLinkLoad      : 1081
number of tunnels   : 10
pre-optimization max link utilization 1.1621184137279998
post-optimization max link utilization 1.0821321916239999
1 demands over 702 (0.14245014245014245%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.826144277