
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1143		2		121
1136		3		133
1131		4		148
1124		5		154
1118		6		164
1111		7		170
1106		8		175
1099		9		192
1093		10		196
1092		11		200
1086		12		204
1080		13		210
1076		14		218

Optimization completed
----------------------
number of nodes     : 27
number of edges     : 58
number of demands   : 702
first solution time : 4
optimization time   : 180939
initial max maxLinkLoad    : 1149
final max maxLinkLoad      : 1076
number of tunnels   : 14
pre-optimization max link utilization 1.1500929924439998
post-optimization max link utilization 1.0773712010319996
1 demands over 702 (0.14245014245014245%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.955833733
