
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1133		1		107
1127		2		118
1126		3		129
1121		4		138
1114		5		153
1110		6		157
1102		7		162
1098		8		166
1090		9		171
1085		10		179
1079		11		183
1077		12		188
1073		13		190
1068		14		194

Optimization completed
----------------------
number of nodes     : 27
number of edges     : 58
number of demands   : 702
first solution time : 3
optimization time   : 180656
initial max maxLinkLoad    : 1140
final max maxLinkLoad      : 1068
number of tunnels   : 14
pre-optimization max link utilization 1.140656059644
post-optimization max link utilization 1.068815107872
2 demands over 702 (0.2849002849002849%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.673693496
