
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1174		1		104
1166		2		118
1142		3		123
1131		4		136
1110		5		139
1099		6		143
1080		7		147
1065		8		153
1047		9		156
1030		10		161
1016		11		181
1013		12		186
996		13		190
981		14		191
963		15		193
945		16		195
931		17		197
912		18		199
909		19		211
907		22		43113
905		22		51125
899		22		58140
897		23		64149
896		26		71198
895		26		97230

Optimization completed
----------------------
number of nodes     : 16
number of edges     : 34
number of demands   : 240
first solution time : 2
optimization time   : 180373
initial max maxLinkLoad    : 1181
final max maxLinkLoad      : 895
number of tunnels   : 27
pre-optimization max link utilization 1.1816273480555555
post-optimization max link utilization 0.8963589860666666
3 demands over 240 (1.25%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.388086873
