
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1177		1		96
1147		2		112
1120		3		118
1114		3		127
1100		4		131
1079		5		139
1069		6		141
1055		7		148
1047		8		150
1041		9		153
1012		10		164
1006		11		166
980		12		169
971		13		174
954		14		176
948		15		178
945		16		181
944		17		212
919		18		224
917		19		261
913		20		264
910		19		432
900		20		449
899		20		47764
898		21		58779
897		24		59785
889		25		59788
887		25		66800
886		24		74813
884		24		84826

Optimization completed
----------------------
number of nodes     : 16
number of edges     : 34
number of demands   : 240
first solution time : 3
optimization time   : 180932
initial max maxLinkLoad    : 1194
final max maxLinkLoad      : 884
number of tunnels   : 24
pre-optimization max link utilization 1.1951423254333333
post-optimization max link utilization 0.8849201657000001
2 demands over 240 (0.8333333333333334%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.952753233
