              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1165		1		86
1133		2		99
1117		3		106
1098		4		116
1091		5		121
1063		6		125
1061		7		129
1058		7		134
1029		8		138
1026		9		152
996		10		161
993		11		164
978		12		166
977		13		167
962		14		169
957		15		171
946		16		172
922		18		176
919		19		178
918		20		179
917		21		183
915		22		333
912		26		1664
909		22		46717
905		22		51727
904		22		56910
901		23		56913
896		24		62922
894		25		68931
892		25		79946

Optimization completed
----------------------
number of nodes     : 16
number of edges     : 34
number of demands   : 240
first solution time : 3
optimization time   : 180054
initial max maxLinkLoad    : 1197
final max maxLinkLoad      : 892
number of tunnels   : 25
pre-optimization max link utilization 1.1983056966888888
post-optimization max link utilization 0.893196761
2 demands over 240 (0.8333333333333334%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.068350847