
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1175		1		87
1154		2		99
1142		3		103
1121		4		107
1112		5		110
1092		6		115
1077		7		119
1058		8		123
1044		9		127
1025		10		130
1014		11		145
1010		12		150
992		13		152
980		14		154
977		15		155
975		16		157
957		17		158
952		18		160
946		19		162
941		20		164
923		21		168
921		22		195
918		23		197
907		24		199
896		24		258
895		25		259
894		26		300
893		27		302
892		26		50708
889		29		50711
888		29		50715
887		30		50720
885		29		50722
883		30		58732
880		30		60737
877		30		62742
873		31		69751
872		29		80766

Optimization completed
----------------------
number of nodes     : 16
number of edges     : 34
number of demands   : 240
first solution time : 2
optimization time   : 180875
initial max maxLinkLoad    : 1207
final max maxLinkLoad      : 872
number of tunnels   : 29
pre-optimization max link utilization 1.2074407329222223
post-optimization max link utilization 0.8732561226888887
3 demands over 240 (1.25%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.889339886
