
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1140		1		86
1118		2		105
1111		3		110
1104		4		117
1101		5		120
1083		4		124
1078		5		129
1047		6		135
1014		8		140
1000		10		146
981		11		151
966		12		153
953		13		159
946		14		162
921		15		164
914		16		170
912		17		171
908		18		173
895		19		179
892		20		181
884		21		190
883		22		195
881		23		46464
880		27		64331
879		27		73344
875		25		73346
873		26		73349
871		27		73351
870		28		79359
869		28		79362
868		30		87376
867		33		96417

Optimization completed
----------------------
number of nodes     : 16
number of edges     : 34
number of demands   : 240
first solution time : 2
optimization time   : 180512
initial max maxLinkLoad    : 1149
final max maxLinkLoad      : 867
number of tunnels   : 33
pre-optimization max link utilization 1.1496051134777778
post-optimization max link utilization 0.8678837922888889
4 demands over 240 (1.6666666666666667%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.526662302
