
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1130		1		83
1110		2		103
1095		3		107
1076		4		112
1068		5		121
1041		6		127
1035		7		133
1023		8		138
1009		9		141
989		10		143
980		11		148
971		12		155
960		13		158
956		14		160
944		15		161
929		16		170
922		16		173
912		17		175
902		18		179
898		18		474
894		19		595
880		20		597
878		21		50114
874		24		52119
868		25		52121
866		25		52124
865		25		58132
864		32		58682
863		36		75854
862		35		86537

Optimization completed
----------------------
number of nodes     : 16
number of edges     : 34
number of demands   : 240
first solution time : 2
optimization time   : 180633
initial max maxLinkLoad    : 1163
final max maxLinkLoad      : 862
number of tunnels   : 35
pre-optimization max link utilization 1.1636614278666666
post-optimization max link utilization 0.8632841601333333
2 demands over 240 (0.8333333333333334%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.645518703
