
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
797		1		92
787		2		103
763		3		109
744		4		116
742		5		121
729		6		126
723		6		136
712		7		149
703		8		152
701		9		155
695		10		157

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 54
number of demands   : 380
first solution time : 3
optimization time   : 180675
initial max maxLinkLoad    : 809
final max maxLinkLoad      : 695
number of tunnels   : 10
pre-optimization max link utilization 0.8096927547142857
post-optimization max link utilization 0.6953569720000001
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.692949114
