
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
779		1		120
773		2		129
750		3		139
739		4		151
732		5		155
717		6		159
715		7		163
701		8		174
693		9		180
690		10		187

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 54
number of demands   : 380
first solution time : 4
optimization time   : 180802
initial max maxLinkLoad    : 821
final max maxLinkLoad      : 690
number of tunnels   : 10
pre-optimization max link utilization 0.8220993955714285
post-optimization max link utilization 0.6902596654571429
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.820453901
