
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
790		1		152
769		2		177
754		3		191
746		4		205
712		5		220
711		6		224
691		7		228
681		8		231

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 54
number of demands   : 380
first solution time : 3
optimization time   : 180596
initial max maxLinkLoad    : 832
final max maxLinkLoad      : 681
number of tunnels   : 8
pre-optimization max link utilization 0.8324881022142857
post-optimization max link utilization 0.6822239429428573
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.615656565
