
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
818		1		90
802		2		98
780		3		104
759		4		109
739		5		114
733		7		122
718		8		125
703		9		127

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 54
number of demands   : 380
first solution time : 2
optimization time   : 180326
initial max maxLinkLoad    : 836
final max maxLinkLoad      : 703
number of tunnels   : 9
pre-optimization max link utilization 0.8368797656857143
post-optimization max link utilization 0.7038519604
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.337746153
