
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
795		1		93
780		2		100
750		3		108
739		4		111
717		5		120
708		6		124
702		7		129
690		8		133
688		9		135

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 54
number of demands   : 380
first solution time : 2
optimization time   : 180922
initial max maxLinkLoad    : 801
final max maxLinkLoad      : 688
number of tunnels   : 9
pre-optimization max link utilization 0.8020858066428571
post-optimization max link utilization 0.6889155959428572
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.93637842
