
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
802		1		94
795		2		104
780		3		110
757		4		115
736		5		119
715		6		123
714		7		127
704		8		135
700		8		138
692		8		142
691		10		147

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 54
number of demands   : 380
first solution time : 2
optimization time   : 180875
initial max maxLinkLoad    : 816
final max maxLinkLoad      : 691
number of tunnels   : 11
pre-optimization max link utilization 0.8171855904857144
post-optimization max link utilization 0.6915171548000001
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.884683099
