
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
644		2		113
642		4		122
637		6		130
636		7		2012
633		7		2014
632		10		2018
631		12		6104
630		12		6105
629		12		6106

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 34
number of demands   : 156
first solution time : 2
optimization time   : 180291
initial max maxLinkLoad    : 645
final max maxLinkLoad      : 629
number of tunnels   : 12
pre-optimization max link utilization 0.6456047017
post-optimization max link utilization 0.6296710845428571
2 demands over 156 (1.2820512820512822%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.304719748
