
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
624		1		103
623		2		123
621		4		158
617		6		199
616		9		403
607		10		407

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 34
number of demands   : 156
first solution time : 2
optimization time   : 180153
initial max maxLinkLoad    : 631
final max maxLinkLoad      : 607
number of tunnels   : 10
pre-optimization max link utilization 0.6318131860999999
post-optimization max link utilization 0.6078681492571429
1 demands over 156 (0.6410256410256411%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.163921419
