
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
640		2		97
636		4		107
635		6		231
633		9		3345
631		9		3347

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 34
number of demands   : 156
first solution time : 2
optimization time   : 180543
initial max maxLinkLoad    : 643
final max maxLinkLoad      : 631
number of tunnels   : 9
pre-optimization max link utilization 0.6434797313142858
post-optimization max link utilization 0.6314380229857142
2 demands over 156 (1.2820512820512822%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.55564486
