
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
635		1		104
634		3		125
632		3		165
630		5		188
629		6		5918
627		6		5920
626		10		5999
625		11		6019
624		13		6020
622		15		6022

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 34
number of demands   : 156
first solution time : 4
optimization time   : 180420
initial max maxLinkLoad    : 644
final max maxLinkLoad      : 622
number of tunnels   : 15
pre-optimization max link utilization 0.6446033036928573
post-optimization max link utilization 0.6225470263571428
4 demands over 156 (2.5641025641025643%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.433987232
