
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
641		1		103
639		3		124
638		5		184
636		5		205
634		5		371
633		7		380
629		10		1308
628		10		1310

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 34
number of demands   : 156
first solution time : 3
optimization time   : 180022
initial max maxLinkLoad    : 648
final max maxLinkLoad      : 628
number of tunnels   : 10
pre-optimization max link utilization 0.6485410456071429
post-optimization max link utilization 0.6290306075142857
2 demands over 156 (1.2820512820512822%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.037898602
