
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
653		2		114
652		4		121
651		7		2822
650		9		2824
649		11		2826
648		13		2827
647		13		2829

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 34
number of demands   : 156
first solution time : 5
optimization time   : 180229
initial max maxLinkLoad    : 655
final max maxLinkLoad      : 647
number of tunnels   : 13
pre-optimization max link utilization 0.655260041842857
post-optimization max link utilization 0.6479490916428571
5 demands over 156 (3.2051282051282053%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.246809336
