
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
630		1		109
629		3		126
620		4		136
619		4		147
617		6		174
616		8		371
614		19		10568
613		21		10573

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 34
number of demands   : 156
first solution time : 2
optimization time   : 180787
initial max maxLinkLoad    : 633
final max maxLinkLoad      : 613
number of tunnels   : 21
pre-optimization max link utilization 0.63356359435
post-optimization max link utilization 0.6140931962857143
4 demands over 156 (2.5641025641025643%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.80502327
