
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
643		1		85
640		3		98
637		5		126
636		7		154
635		8		170
633		8		172
630		9		204
629		12		211
628		12		274
627		14		581

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 34
number of demands   : 156
first solution time : 1
optimization time   : 180240
initial max maxLinkLoad    : 646
final max maxLinkLoad      : 627
number of tunnels   : 14
pre-optimization max link utilization 0.6466747854714286
post-optimization max link utilization 0.6277450951857143
2 demands over 156 (1.2820512820512822%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.250263096
