
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
616		2		100
615		6		139
614		6		145
613		8		149
612		12		299
611		14		3996
610		14		3999
609		14		4011

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 34
number of demands   : 156
first solution time : 1
optimization time   : 180575
initial max maxLinkLoad    : 617
final max maxLinkLoad      : 609
number of tunnels   : 14
pre-optimization max link utilization 0.6171659169
post-optimization max link utilization 0.6099073016857143
2 demands over 156 (1.2820512820512822%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.583281713
