
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
621		1		68
618		3		86
617		5		138
616		8		187
614		10		188
613		10		191
612		12		196
611		15		1073
610		15		1074
609		18		1080
608		18		1104

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 34
number of demands   : 156
first solution time : 2
optimization time   : 180385
initial max maxLinkLoad    : 637
final max maxLinkLoad      : 608
number of tunnels   : 18
pre-optimization max link utilization 0.6379428391142856
post-optimization max link utilization 0.6090111641285715
5 demands over 156 (3.2051282051282053%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.394750456
