
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1083		1		103
1073		2		116
1058		3		125
1054		4		130
1044		5		134
1023		6		143
1015		7		149
992		8		159
984		9		162
965		10		167
952		11		170
934		12		173
922		14		178
907		15		181
905		16		188
904		17		205
897		18		207
896		18		211
891		19		221
890		19		226
882		19		237
881		20		239
875		21		242
869		20		244
866		21		249
861		21		266
859		22		269
855		23		274
854		24		281
853		25		7575
852		28		48650
850		28		55667
848		29		66691

Optimization completed
----------------------
number of nodes     : 19
number of edges     : 50
number of demands   : 342
first solution time : 3
optimization time   : 180922
initial max maxLinkLoad    : 1088
final max maxLinkLoad      : 848
number of tunnels   : 29
pre-optimization max link utilization 1.0888277585500001
post-optimization max link utilization 0.8484438151999998
3 demands over 342 (0.8771929824561403%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.939402154
