
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1107		1		114
1104		2		123
1096		3		135
1092		4		147
1077		5		152
1064		6		167
1046		7		173
1037		8		177
1030		9		186
1005		10		190
1000		11		193
986		12		196
975		13		202
956		14		206
945		15		211
931		16		213
928		17		216
920		18		223
915		19		231
913		20		233
911		20		242
907		21		246
899		22		251
897		23		253
895		24		524
892		25		526
890		26		681
889		27		798
885		26		1944
883		27		1946
876		29		1947
872		31		4909
871		31		52776
868		33		59805
866		37		65822
865		37		77848

Optimization completed
----------------------
number of nodes     : 19
number of edges     : 50
number of demands   : 342
first solution time : 4
optimization time   : 180043
initial max maxLinkLoad    : 1132
final max maxLinkLoad      : 865
number of tunnels   : 37
pre-optimization max link utilization 1.13277225877
post-optimization max link utilization 0.8661089622
7 demands over 342 (2.046783625730994%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.062192984
