
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1115		1		91
1093		2		100
1084		3		106
1064		4		110
1053		5		115
1033		6		119
1024		7		122
1018		8		125
1008		9		129
987		10		132
981		11		137
960		12		140
949		13		147
938		14		152
931		14		158
920		15		220
917		16		223
910		17		252
903		17		292
895		18		294
890		19		296
885		20		346
884		21		348
877		22		49861
873		23		49864

Optimization completed
----------------------
number of nodes     : 19
number of edges     : 50
number of demands   : 342
first solution time : 3
optimization time   : 180004
initial max maxLinkLoad    : 1130
final max maxLinkLoad      : 873
number of tunnels   : 23
pre-optimization max link utilization 1.1305735197675002
post-optimization max link utilization 0.8733362089000001
1 demands over 342 (0.29239766081871343%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.016301342
