
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1180		1		98
1176		2		108
1157		3		134
1138		4		151
1088		5		159
1084		6		169
1029		7		178
1015		8		188
1000		9		198
997		11		217
982		12		220
969		13		229
962		14		442
960		14		445
949		16		514

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 30
number of demands   : 156
first solution time : 2
optimization time   : 180294
initial max maxLinkLoad    : 1235
final max maxLinkLoad      : 949
number of tunnels   : 18
pre-optimization max link utilization 1.2362074666999998
post-optimization max link utilization 0.9501839622500001
2 demands over 156 (1.2820512820512822%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.314382736
