              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1218		1		133
1138		2		145
1129		3		156
1128		4		164
1099		5		170
1062		6		174
1020		7		177
1018		8		180
1007		9		183
992		10		201
985		11		204
958		12		207
954		12		215
951		13		268
940		14		271
937		18		559
935		18		1652
933		18		1944
932		21		2454
931		20		2455
927		18		2456
923		19		2458
919		21		2472
917		21		2473
912		22		2474
908		22		2491
907		23		2492
905		26		2493
902		28		7142
901		32		7287
900		33		31929

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 30
number of demands   : 156
first solution time : 2
optimization time   : 180871
initial max maxLinkLoad    : 1225
final max maxLinkLoad      : 900
number of tunnels   : 33
pre-optimization max link utilization 1.2255413995
post-optimization max link utilization 0.9014280325750001
8 demands over 156 (5.128205128205129%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.889184926