
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1182		1		120
1174		2		137
1138		3		153
1137		4		164
1113		5		174
1089		6		179
1058		7		182
1029		7		245
997		8		251
986		10		267
981		11		270
979		12		272
946		13		274
939		14		315
938		17		878
934		18		1014
932		19		1159

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 30
number of demands   : 156
first solution time : 2
optimization time   : 180736
initial max maxLinkLoad    : 1195
final max maxLinkLoad      : 932
number of tunnels   : 19
pre-optimization max link utilization 1.19612335315
post-optimization max link utilization 0.933106934125
1 demands over 156 (0.6410256410256411%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.760777594
