
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1186		1		115
1153		2		124
1151		3		137
1120		4		145
1114		5		149
1067		6		158
1051		7		167
1036		8		178
1006		9		181
990		10		184
971		11		187
969		11		196
962		12		200
958		14		206
951		15		210
947		16		245
942		17		247
935		18		255
934		20		282
931		22		397
926		23		421
925		24		423
924		34		2103
921		35		2105
920		36		2108
917		38		11121
915		37		75833
913		32		81838
912		32		92857
911		29		168737

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 30
number of demands   : 156
first solution time : 2
optimization time   : 180598
initial max maxLinkLoad    : 1189
final max maxLinkLoad      : 911
number of tunnels   : 29
pre-optimization max link utilization 1.1899130701999998
post-optimization max link utilization 0.911319183325
7 demands over 156 (4.487179487179487%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.609758028
