
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1175		1		76
1140		2		87
1101		3		101
1072		4		105
1066		5		109
1064		6		113
1009		7		115
1008		8		117
1001		9		121
989		9		124
963		10		126
938		11		128
931		12		130
920		14		142
914		16		285
910		18		290
909		19		299
906		21		301
905		23		540
904		25		49014

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 30
number of demands   : 156
first solution time : 1
optimization time   : 180898
initial max maxLinkLoad    : 1201
final max maxLinkLoad      : 904
number of tunnels   : 25
pre-optimization max link utilization 1.20228534055
post-optimization max link utilization 0.9050827529000001
5 demands over 156 (3.2051282051282053%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.912326875
