
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1169		1		80
1142		2		91
1106		3		97
1090		4		101
1057		5		105
1053		6		109
1050		7		114
1026		8		119
989		9		127
988		10		131
970		11		133
965		13		145
949		14		165
941		15		172
939		16		277
931		18		284
917		19		299
914		21		333
913		23		472

Optimization completed
----------------------
number of nodes     : 13
number of edges     : 30
number of demands   : 156
first solution time : 2
optimization time   : 180860
initial max maxLinkLoad    : 1197
final max maxLinkLoad      : 913
number of tunnels   : 23
pre-optimization max link utilization 1.19748852835
post-optimization max link utilization 0.9142936529500001
7 demands over 156 (4.487179487179487%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.873265136
