
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1073		1		99
1072		2		108
1049		3		114
1048		5		143
1027		6		148
1025		7		151
1024		8		168
1021		9		172
1012		9		184
1005		10		190
1001		11		193
997		12		196
988		13		199
986		14		2393
983		14		2397
982		15		5415
980		16		5433
978		17		5434
975		18		5436
968		20		5476
967		21		5478
966		22		5479
964		23		5480
961		24		5481
956		25		5491
951		25		5502
949		26		5503
947		27		12165
945		28		12167
942		29		17238
937		30		17245
936		32		60415
935		34		60420
934		35		60424
933		36		95633

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 52
number of demands   : 380
first solution time : 3
optimization time   : 180822
initial max maxLinkLoad    : 1084
final max maxLinkLoad      : 933
number of tunnels   : 36
pre-optimization max link utilization 1.084535298253846
post-optimization max link utilization 0.9343536715692307
5 demands over 380 (1.3157894736842106%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.839372747
