
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1091		1		85
1081		2		98
1069		3		120
1057		4		125
1048		5		130
1035		6		134
1024		7		139
1011		8		144
1001		9		147
996		10		163
992		10		181
989		11		192
984		12		195
977		13		198
968		14		200
965		15		208
963		16		241
962		17		254
958		18		257
950		19		1874
949		20		1876
948		21		1877
947		23		1886
946		24		1887
945		25		1889
944		26		1889
937		27		1892
934		28		1892
930		29		1964
928		30		1966
926		31		1967
923		32		1968
922		33		1969
921		34		1970
917		37		1982
916		38		3018
914		39		3020
908		41		18745
906		40		18748
901		44		18800
899		46		18808
898		45		92038
897		44		121107

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 52
number of demands   : 380
first solution time : 2
optimization time   : 180237
initial max maxLinkLoad    : 1105
final max maxLinkLoad      : 897
number of tunnels   : 44
pre-optimization max link utilization 1.1061456144153845
post-optimization max link utilization 0.898312805723077
9 demands over 380 (2.3684210526315788%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.251169937
