
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1096		1		89
1074		2		102
1051		3		107
1027		4		112
1025		5		117
1024		6		121
1006		7		136
1003		8		170
1002		9		2845
999		10		2847
995		11		5065
994		11		5067
993		12		5605
989		13		5607
984		14		8647
982		16		9650
979		18		9652
977		19		9653
974		20		13862
967		21		13866
966		24		18939
962		26		19945
958		27		19947
955		28		19948
953		29		19950
952		29		24957
950		30		24958
949		31		24960
948		29		118193
947		30		127241
946		34		145375

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 52
number of demands   : 380
first solution time : 2
optimization time   : 180452
initial max maxLinkLoad    : 1119
final max maxLinkLoad      : 946
number of tunnels   : 34
pre-optimization max link utilization 1.1198124941923078
post-optimization max link utilization 0.9463904319076925
2 demands over 380 (0.5263157894736842%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.47019696
