
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1071		1		90
1054		2		102
1048		3		106
1032		4		112
1024		5		117
1013		6		120
1007		7		124
1003		8		130
996		9		133
995		10		136
989		11		139
981		12		144
977		13		1496
975		14		2500
971		15		3513
970		17		3515
968		19		5335
959		20		5337
957		22		5338
952		25		9289
949		25		9291
948		26		9292
945		27		11294
944		27		11296
938		30		12010
936		32		17364
935		34		17368
927		35		17370
924		35		31386
923		33		73478
922		36		81500

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 52
number of demands   : 380
first solution time : 3
optimization time   : 180733
initial max maxLinkLoad    : 1095
final max maxLinkLoad      : 922
number of tunnels   : 36
pre-optimization max link utilization 1.095559073453846
post-optimization max link utilization 0.931523467076923
5 demands over 380 (1.3157894736842106%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.749296293
