
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1092		1		96
1075		2		104
1068		3		112
1052		4		118
1046		5		124
1034		6		137
1028		7		142
1025		8		149
1005		9		156
1003		10		159
1001		11		162
998		12		165
996		13		168
995		14		177
994		15		186
985		16		188
982		17		6222
980		18		6224
975		19		7227
974		21		7229
973		22		8231
972		25		12241
971		27		12243
970		27		13295
966		28		13298
960		29		13300
957		34		30326
955		34		30328
954		35		34389
952		35		34391

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 52
number of demands   : 380
first solution time : 3
optimization time   : 180721
initial max maxLinkLoad    : 1115
final max maxLinkLoad      : 952
number of tunnels   : 36
pre-optimization max link utilization 1.1158438872538463
post-optimization max link utilization 0.9524445530153844
4 demands over 380 (1.0526315789473684%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.73596496
