
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1085		1		101
1081		2		112
1062		3		120
1057		4		129
1038		5		133
1033		6		138
1014		7		143
1011		8		147
1003		9		151
996		10		173
992		11		181
987		12		184
978		13		186
977		14		247
976		16		666
974		17		669
964		18		671
962		19		1734
961		18		1735
960		19		1739
958		21		1802
954		23		1844
949		23		1845
946		24		1847
944		25		1852
942		26		9495
941		27		14504
940		28		14507
937		29		14511
936		31		16515
935		32		16517
930		35		16629
929		37		16631
928		38		17888
919		40		19894
916		42		19897
915		46		108088
910		45		126146
909		46		138186

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 52
number of demands   : 380
first solution time : 3
optimization time   : 180286
initial max maxLinkLoad    : 1107
final max maxLinkLoad      : 909
number of tunnels   : 44
pre-optimization max link utilization 1.1081308337846152
post-optimization max link utilization 0.91012448235
9 demands over 380 (2.3684210526315788%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.304445644
