
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1061		1		132
1049		2		145
1037		3		150
1026		4		156
1024		5		165
1002		6		169
1001		7		174
999		8		177
990		9		181
981		10		184
978		11		187
976		13		321
971		14		325
970		15		4067
967		17		4072
963		18		4073
959		19		4226
954		20		4228
951		22		6279
949		25		15291
948		28		16296
946		30		16304
945		31		16306
944		33		16309
934		34		18313
933		34		19315
932		34		19317
931		35		19319
925		36		19328
923		37		96690

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 52
number of demands   : 380
first solution time : 3
optimization time   : 180878
initial max maxLinkLoad    : 1082
final max maxLinkLoad      : 923
number of tunnels   : 37
pre-optimization max link utilization 1.0833423980692307
post-optimization max link utilization 0.9238315723384616
3 demands over 380 (0.7894736842105263%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.894255159
