
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1079		1		85
1054		2		92
1043		3		103
1032		4		107
1021		5		113
1008		6		116
1007		7		120
999		8		130
996		9		134
994		10		137
986		11		1092
985		12		1094
983		13		5226
982		14		5230
972		16		5231
968		17		5232
965		18		5233
964		19		9887
961		20		15894
959		21		15907
955		23		15909
954		24		16911
953		25		19916
952		27		19925
949		26		63977
947		30		76945
946		32		113998
945		30		153511
944		30		160534

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 52
number of demands   : 380
first solution time : 3
optimization time   : 180558
initial max maxLinkLoad    : 1103
final max maxLinkLoad      : 944
number of tunnels   : 30
pre-optimization max link utilization 1.1037371730846153
post-optimization max link utilization 0.9451641068307692
5 demands over 380 (1.3157894736842106%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.569601325
