
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1081		1		86
1064		2		99
1057		3		105
1039		4		110
1034		5		120
1016		6		125
1012		7		128
1011		8		133
1009		10		545
999		11		548
992		12		551
989		12		577
988		13		579
987		15		4388
986		17		4395
984		18		4415
982		20		5823
977		21		5825
975		22		13941
967		23		18951
965		24		18983
963		24		19987
962		25		19989
955		24		28004
954		25		28006
953		26		32008
951		26		76105

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 52
number of demands   : 380
first solution time : 4
optimization time   : 180356
initial max maxLinkLoad    : 1088
final max maxLinkLoad      : 951
number of tunnels   : 26
pre-optimization max link utilization 1.0886894271884615
post-optimization max link utilization 0.9520538834461537
1 demands over 380 (0.2631578947368421%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.37251641
