
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1072		1		101
1053		2		117
1051		3		122
1039		4		130
1030		5		137
1027		6		140
1024		7		144
1015		8		148
1003		9		162
999		11		170
994		12		173
992		13		176
991		14		179
987		15		193
982		16		217
975		17		219
970		18		2814
968		22		3074
967		23		3076
963		24		3077
959		24		3078
958		25		3079
957		26		7166
956		27		7168
955		28		9172
953		29		12176
952		29		16184
951		30		16187
948		30		17190
947		34		18202
946		36		18583
939		38		24594
937		37		34607
933		38		34610
931		36		71979
930		37		71984
929		38		71988

Optimization completed
----------------------
number of nodes     : 20
number of edges     : 52
number of demands   : 380
first solution time : 2
optimization time   : 180234
initial max maxLinkLoad    : 1095
final max maxLinkLoad      : 929
number of tunnels   : 38
pre-optimization max link utilization 1.0955877424846152
post-optimization max link utilization 0.9304239703307693
8 demands over 380 (2.1052631578947367%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.249255896
