
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1142		1		122
1137		3		140
1127		4		145
1121		5		154
1114		6		158
1111		7		162
1099		8		172
1096		9		176
1084		10		179
1081		11		182
1069		12		201
1067		13		204
1054		14		207
1052		15		213
1038		16		216
1030		18		221
1024		19		278
1022		20		615
1021		21		623
1016		22		633
1009		23		636
1003		24		638
994		25		641
987		27		684
986		28		686
981		29		688
979		30		691
976		29		692
974		30		801
970		31		803
969		32		887
962		33		889
961		34		916
958		35		919
957		37		1991

Optimization completed
----------------------
number of nodes     : 24
number of edges     : 50
number of demands   : 552
first solution time : 4
optimization time   : 180362
initial max maxLinkLoad    : 1152
final max maxLinkLoad      : 957
number of tunnels   : 37
pre-optimization max link utilization 1.15292234721
post-optimization max link utilization 0.95832903451
1 demands over 552 (0.18115942028985507%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.390574992
