
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1158		1		116
1150		2		131
1142		3		140
1127		5		157
1114		7		184
1112		8		199
1098		9		205
1096		10		209
1082		11		216
1081		12		219
1067		13		222
1065		14		226
1052		15		229
1049		16		233
1041		17		236
1040		18		249
1037		19		251
1035		20		267
1029		21		289
1028		23		304
1021		24		333
1019		25		352
1014		26		1462
1011		27		1464
1004		28		1467
1001		29		1471
997		30		1472
996		31		1499
990		32		1679
984		33		2268
982		32		2930

Optimization completed
----------------------
number of nodes     : 24
number of edges     : 50
number of demands   : 552
first solution time : 2
optimization time   : 180311
initial max maxLinkLoad    : 1166
final max maxLinkLoad      : 982
number of tunnels   : 33
pre-optimization max link utilization 1.16698604354
post-optimization max link utilization 0.98251155917
2 demands over 552 (0.36231884057971014%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.328375952
