
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1174		1		104
1158		2		113
1143		3		119
1135		4		127
1128		5		140
1127		6		145
1115		7		151
1112		8		154
1099		9		216
1098		10		243
1083		11		292
1071		13		300
1068		14		303
1063		17		369
1061		18		372
1054		19		374
1049		20		386
1039		21		388
1035		22		393
1031		23		411
1028		23		414
1020		24		444
1016		25		447
1012		26		449
1009		28		461
997		29		463
995		30		467
990		32		474

Optimization completed
----------------------
number of nodes     : 24
number of edges     : 50
number of demands   : 552
first solution time : 3
optimization time   : 180980
initial max maxLinkLoad    : 1189
final max maxLinkLoad      : 990
number of tunnels   : 32
pre-optimization max link utilization 1.19023859703
post-optimization max link utilization 0.99063201401
2 demands over 552 (0.36231884057971014%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.995737001
