
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1183		1		126
1169		2		150
1167		3		155
1154		4		169
1152		5		179
1138		6		186
1136		7		191
1123		8		195
1121		9		198
1108		10		205
1107		11		209
1099		12		211
1092		13		219
1085		14		239
1078		16		246
1069		17		258
1067		18		261
1062		19		263
1053		20		266
1046		21		268
1038		22		271
1030		23		272
1028		24		274
1022		26		2399
1021		27		2565
1007		28		3578
1006		29		3579
994		30		3580
993		30		4491
991		31		4492
981		34		4511

Optimization completed
----------------------
number of nodes     : 24
number of edges     : 50
number of demands   : 552
first solution time : 3
optimization time   : 180962
initial max maxLinkLoad    : 1199
final max maxLinkLoad      : 981
number of tunnels   : 34
pre-optimization max link utilization 1.19967162405
post-optimization max link utilization 0.9819559596199999
2 demands over 552 (0.36231884057971014%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.979648395
