
              OPTIMIZATION              
----------------------------------------
max maxLinkLoad	#tunnels	time (ms)
----------------------------------------
1110		1		72
1103		2		80
1095		3		85
1088		4		89
1073		6		107
1065		8		120
1058		9		131
1043		11		141
1042		13		149
1035		14		151
1030		15		154
1029		17		186
1027		18		241
1022		19		251
1012		20		279
1007		22		287
996		23		289
995		24		292
993		25		317
991		24		318
990		24		338
977		26		369
976		27		371
975		29		384
968		30		392
967		31		447
966		32		1728
961		34		2731
956		35		2770

Optimization completed
----------------------
number of nodes     : 24
number of edges     : 50
number of demands   : 552
first solution time : 2
optimization time   : 180043
initial max maxLinkLoad    : 1117
final max maxLinkLoad      : 956
number of tunnels   : 35
pre-optimization max link utilization 1.1175701385949999
post-optimization max link utilization 0.9568563130100002
3 demands over 552 (0.5434782608695652%) have a different segment routing path between pre-optimization and post-optimization

Optimization time (in seconds): 180.05947791
